Library Catalog
Latest Documents and Publications listed. Use search terms in the box below to find what you need
Publication Type:
Other
Publication Date:
Author:
Conze,P.; Labahn,T.
Corporate Author:
German Agency for Technical Cooperation
Publication Type:
Other
Publication Date:
Author:
Loth, P.,E.; Prins, H.
Corporate Author:
Comprehensive groundwater development project Volume III - Hydrogeology
During the course of the Comprehensive ground water development project (CGDP)a total of 118 boreholes were drilled in the Bay Region and Central Rangelands. 95 of these were in the Bay Region and 23 in the Central Rangelands. The data accumulated in this efort are subject of this volume of the report. Well data is presented in table 3.1.1 of the report. ol; bVolumes/b: br; li Executive Summary /li liGeneral Activities/li li; bHydrogeology/b; /li liAppendix for volume 2/li liAppendices for volume 3/li /ol
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Roscoe Moss Inc, Louis Berger International Inc
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Roscoe Moss Inc, Louis Berger International Inc
Pilot watershed management for soil and water conservation and Small Garden Development, Volume I - Background and Watershed management
This report is as a result of a feasibilty study on watershed management in Selected sub-watersheds to carry ou planning and control design for th development ofd Somali irrigated horticultural gardens.
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Tippetts-Abbett-Mc Cathy-Stratton
Hydrogeology and water quality of Southern Somalia Volume II - Hydrogeochemical data
This technical report is a part of a series of reports to be prepared during the course of the GTZ Water Quality database project. The activities relate to the assessment of the geological and water quality conditions of the Central Somalia were carried out from March to July 1986
Publication Type:
Other
Publication Date:
Author:
Faillace, C., Faillace E.,R.
Corporate Author:
German Agency for Technical Cooperation, Water Development Agency, Somalia
Review note on Fanoole rice project rice milling facilities
(Extract from the SUMMARY )Br This note considers the consequences of using the rice milling facilities recently constructed at the Fanoole Rice Project (FRP) to mill rice produced on the Mogambo. Irrigation Project (MIP) as an alternative to providing this project with its own milling facilities. The following main conclusions are reached: br (i) The processing capacity at FRP is insufficient to handle the entire crop production from the Mogambo Project. br (II) The comparison of capital and running costs of the two alternatives given below clearly indicates the advantages of a separate mill for Mogambo. br
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited, John Bingle Pty. Limited
Farjano settlement project - Land evaluation
(Extract From Introduction)This land evaluation of the Farjano Settlement Project in the Lower Shabeelle Region of Somalia examined 16 000 hectares of alluvial soils. The evaluation was requested by UNHCR with the aim of locating land suitable for semimechanised rainfed (dryland) agriculture on which refugee settlers will become farmers, under the direction of a.farm management system that provides land preparation and planting services. The evaluation was also to examine the land suitability for settlement location, forestry and small-scale irrigation. A topographic survey was to be carried out to provide a contoured base map, and an additional topographicai survey was requested of the Farjano village irrigated farm (Sheikh Mohammed Hikam).
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Sir M MacDonald and Partners Limited
Comprehensive groundwater development project, Volume 1 - Executive Summary
The comperehensive groundwater development project (CGDP) has been in progress since July 1981 under the Water development Agency of the Ministry of Minerals and Water Resources, Somali Democratic Republic. Originally it was scheduled to end in 1984, the project was extended until July, 1986. This interim report provides an update of project activities from July 1984 to July 1985. The report covers six of the project components concerned:ol; liDrilling program/li; liHydrogeology or data collected/li; liInstitutional support/li; liPrivate sector study/li; liRecomended programs/li; liDemobilization./li; /ol Volumes:ol li Executive Summary /li liGeneral Activities/li liHydrogeology/li liAppendix for volume 2/li liAppendices for volume 3/li /ol
Publication Type:
Other
Publication Date:
Author:
Corporate Author:
Louis Berger International Inc, Roscoe Moss Inc
Publication Type:
Other
Publication Date:
Author:
Planning and development collaborative International
Corporate Author:
Unites State Agency for International Development
Pages
RSS feed [compliant with the Agris AP] | Agris AP XML